Impact windows & doors project · Coral Gables, FL

Mr. Glass Window and Door Replacement in Coral Gables

Explore this home's window and door replacement: the existing openings, the Mr. Glass production order and the permit closeout.

See Project Photos ↓
Project areaCoral Gables, FloridaReplacement units15 windows + 1 doorManufacturerMr. GlassFrame finishBronze powder coat

Project overview

New windows and a door for this Coral Gables home.

The before photographs show older white-framed windows with grid bars, some beneath aluminum awnings, and a white French door at the rear.

The Mr. Glass production order lists 16 replacement units: 15 windows and one outswing entrance door, all with bronze powder-coated frames.

Work included

  • Replacement window and door units listed in the Mr. Glass production order.
  • Casement, horizontal rolling and single-hung window series, plus two MG-350 Pw units.
  • Mullions included in the permit scope.

The City of Coral Gables permit describes installation of impact windows and doors with mullions.

Materials and products

What the production order lists.

ProductUnitsFlorida Product Approval
Series 600 casement windows8FL29676-R2
MG-350 horizontal rolling windows3FL41890-R2
MG-350 single-hung windows2FL41887-R2
MG-350 Pw windows2FL41889-R2
Series 3000 outswing entrance door1FL26942-R6
Mullions—FL40673-R3

Frames: bronze powder coat on every unit. The finish can appear darker in photographs.

Window glass: laminated impact glass with 1/8-inch clear heat-strengthened glass, a 0.090-inch PVB interlayer and 1/8-inch clear heat-strengthened glass. Two casement units have a white privacy interlayer.

Door glass: 3/16-inch glass, a 0.090-inch PVB interlayer and 3/16-inch glass.

Permit closeout

City of Coral Gables.

Permit: BLDR-26-01-8749
Applied: January 28, 2026
Issued: March 20, 2026
Finaled: June 25, 2026

The permit portal lists the project as Finaled. These are permit dates, rather than installation dates.

Workmanship warranty

10-year workmanship coverage.

The workmanship warranty starts at the final inspection on June 25, 2026 and is not transferable.

Explore Warranty Details

About this project

Project details at a glance.

How many windows and doors were ordered?

The production order lists 15 windows and one door, for a total of 16 replacement units.

What does the frame finish look like?

The order specifies bronze powder coat. Lighting and camera exposure can make the frames appear very dark in photographs.

Do the photos show the finished project?

The gallery shows the home before replacement, and the installation section shows new windows while work was still underway. These are not photographs of the complete finished project.

Who issued the permit?

The City of Coral Gables issued permit BLDR-26-01-8749, marked Finaled on June 25, 2026.

Installation progress

The new windows taking shape.

These views show new dark-framed windows during installation, with work still underway around the openings.

IN PROGRESS
New dark-framed window during installation at the Coral Gables home
In progress · New window and surrounding work area
In progress · New outward-opening window

Plan your own project

Explore products and compare proposals.

Window and door estimator

Explore a starting range for your planned openings.

Estimate My Windows

Compare contractor proposals

Review products, installation scope and warranty wording.

Compare Proposals

Planning your own window and door project?

Tell Bigfoot Windows and Roofing about your home and the openings you want to replace.

Get a Free Quote← Explore More Projects
Updated October 2026